Projects

Central Processing Facility

Green field 320 m3/d (2,000bbl/day) Oil Treating battery with 20 MMScfd Gas Plant project to handle emulsion from gathering system and internal trucked-in fluid.  The facility was planned for...

read more
Manitok Processing Facility
Manitok Processing Facility - model
Manitok Processing Facility 2

Booster Station

Brown field 160 m3/d (1,000bbl/day) Booster Station project to handle emulsion from gathering system boosted to the main oil treating battery and gas plant.  The facility upgrade included...

read more
Booster Station - building

Battery Upgrade

Brown field 1,270 m3/d (8,000bbl/day) Oil Treating Battery Upgrade project to handle emulsion from gathering system, internal trucked-in fluid and third party trucked-in fluid.  The facility...

read more
Booster Station - model 01
Booster Station - model 02

Water Injection Facility

Green field 7,854 m3/d (50,000bbl/day) Enhanced Oil Recovery Water Injecation Facilities project to inject water into and a mature oil reservoir.  There were five water injection facilities...

read more
Water Injection Facility 752
Water Injection Facility 752-1
Water Injection Facility 752-2

Gas Plant Upgrade

Brown field 283 e3m3/d (10 MM Scf) Gas Plant Upgrade project to handle solution gas from Oil Treating Battery.  The facility included Inlet Separator, Regrigeration Unit, Booster Compressor,...

read more
03-27 Gas Plant - model
03-27 Gas Plant