Green field 320 m3/d (2,000bbl/day) Oil Treating battery with 20 MMScfd Gas Plant project to handle emulsion from gathering system and internal trucked-in fluid. The facility was planned for...
Brown field 160 m3/d (1,000bbl/day) Booster Station project to handle emulsion from gathering system boosted to the main oil treating battery and gas plant. The facility upgrade included...
Brown field 1,270 m3/d (8,000bbl/day) Oil Treating Battery Upgrade project to handle emulsion from gathering system, internal trucked-in fluid and third party trucked-in fluid. The facility...
Green field 7,854 m3/d (50,000bbl/day) Enhanced Oil Recovery Water Injecation Facilities project to inject water into and a mature oil reservoir. There were five water injection facilities...
Brown field 283 e3m3/d (10 MM Scf) Gas Plant Upgrade project to handle solution gas from Oil Treating Battery. The facility included Inlet Separator, Regrigeration Unit, Booster Compressor,...