Purpose of the project was to develop an As- Built report of the Electricity generation, transmission and distribution facility in the country of Equatorial Guinea (E.G). The report was created by...
Client requested the OTSG burners be reviewed to identify thewhat is causing flashing on the tubes while burners were firing at capacity. BSG Engineering's scope include site inspection, CFD...
Mulitiple Single and Multi-Well Tie-ins which were tied into an existing gathering system. To optimize execute typicals were designed to minimize procurment and installation costs. BSG...
Mulitiple Single Well Tie-ins which were tied into an existing gathering system. To optimize execute typicals were designed to minimize procurment and installation costs. BSG Engineering was...
Mulitiple Green field Single Well Batteries which were later tied into gathering system for multiple sattelites and hundres of kilometers of steel pipeline to a central processing facility. ...