Mulitiple Green field Single Well Batteries which were later tied into gathering system for multiple sattelites and hundres of kilometers of steel pipeline to a central processing facility. The satteline facility included Inlet Separator, oil, water and gas measurment compete with electronic controls and safety system tied to a pop tank . Typicals were created to optimize the execution. BSG Engineering was responsible to design, regulatory registration and compliance, procrument and construction support.